Archive for October, 2004

Temporary Locations on First Floor

Friday, October 22nd, 2004

As the final phase moves long, all libarary services have been moved to the first floor of the library.
phase3A10-22-04.jpg
Here is the temporary circulation desk.

phase3B10-22-04.jpg
This is periodicals.

phase3C10-22-04.jpg
Here is the reference collection.

Move to Phase Three!

Friday, October 22nd, 2004

This week has been a busy week. Our staff has done a great job moving circulation and reference to the first floor to make way for the final phase of the remodeling.

upstairsA10-22-04.jpg
Here is the former location of the reference desk.

upstairsB10-22-04.jpg
Here is the empty circulation desk.

upstairsC10-22-04.jpg
This is the area that used to house the open computers.

Carpeting 2nd Floor!

Wednesday, October 13th, 2004

We are happy to see everything coming together. Phase 2, which includes the north half of the second floor, is moving along. Carpet is being laid. This means that Phase 3, which includes the south half of the second floor, will be next!

nanoffice10-04.jpg
Here is Nancy in her future office.

puttingdowncarpet10-04.jpg
Carpet spreading out.

carpetII10-14-04.jpg
Rolling carpet.

classroom10-13-04.jpg
Here is one of the library’s new classrooms.

Temporary Library Entrance Starting October 25th

Tuesday, October 12th, 2004

As the library’s remodeling enters it’s final “chapter,” the entrance to the library will temporarily move to the north side L Building. Beginning October 25th, students, staff and members of the public will enter the library through the L Building parking lot.

Library Will Be Closed Due to Remodeling: Oct. 21-24

Tuesday, October 12th, 2004

Due to the library’s remodeling, the library will be closed October 21st-24th. A temporary lab will be set up on Friday October 22nd from 8am-4pm where students can research. Regular library hours will resume Monday, October 25th.

Paint on the 2nd Floor

Wednesday, October 6th, 2004

The ladies and gentlemen working on the north side of the second floor have been painting and finishing up walls. Some of the lighting has been put in as well.

2ndfloorceiling10-04.jpg

Moving the Computer Lab!

Wednesday, October 6th, 2004

Today is a pretty big day, since we are preparing to move to the final phase of the library’s construction. A major part of this move is moving the open computer lab into its temporary loation on the second floor. This is a tough project, but our IT staff are in control.

computerlabpack10-04.jpg
Here are machines waiting to be moved.

Artmoving10-04.jpg
Here is Art with a load of computers.

templabspace10-04.jpg
Here is one area of temporary computers.

templabspace210-04.jpg
Here are more computers in their temporary space.