Carpet, Wires, Walls, and Entrances
Tuesday, November 2nd, 2004We’ve had some big changes over the last week. We now have a temporary entrance that we are using during this stage of the remodeling. Things are really looking great.

This photo doesn’t do our new entrance justice, but this is our tempary digs until everything is finished up. Students and the public must use the 107th side of the L Building for the entrance.

This is the current status on the “old” (regular) entrance to the library on the 2nd floor.

The guys are currently wiring the new library classrooms.

Here is the temporary wall in the L Building hallway.