Start Phase 2: North Side of 2nd Floor

Phase 2 has officially started. The construction crew has started ripping up the North half of the second floor. The noise is a bit louder, but we are getting closer!
upstairsmess.jpg
Just a little mess!

2ndfloorwall.jpg
In the back of this photo you can see the temporary wall that has been constructed during this phase. During this phase, everything behind this wall is being gutted.

oldwall.jpg
Here is the old wall/window that seperated the library’s teaching lab from the rest of the library.

hangingfixture.jpg
You never know what you’ll see hanging around.

Comments are closed.