Carpet, Coffee Bar, Reference Desk on 2nd Floor!

December 17th, 2004

The south end of the second floor is getting closer and closer to completion. It is great to see the new carpeting and flooring as the space comes together.

mainfloor12-15-04.jpg
This is the main floor near the library entrance. The new carpet is being put down.

coffeebar12-15-04.jpg
Here is the wood flooring for the coffee bar area.

electronicalley12-15-04.jpg
This will be the area with most of the library’s open computers, known as Electronic Alley.

referencedesk12-15-04.jpg
Here is the reference desk…or at least pieces of it.

Packing Up…One More Time!

December 17th, 2004

The movers arrived again this week and are helping us move one more time. The construction is very close to complete (only a few more weeks!). Everything on the first floor had to be moved so that the rest of the collection can be brought back and reshelved.

booksboxed12-15-04.jpg
Here are boxes of reference books.

studentsworking12-15-04.jpg
Despite the movers, students continued to study for finals.

redmanwaiting12-15-04.jpg
This piece student art, effectionately known as Redman, has become the informal mascot of the library and has kept a close eye on our progress.

pilescomputers12-15-04.jpg
The computers have been removed from the network temporarily and will be set up in the new space soon!

Progress on South Side of 2nd Floor

December 3rd, 2004

Sorry that it’s been so long since the last post about the construction. The crew is really moving along. We are hoping that we will be able to have most of this done very soon. Here are the newest photos!

entrance12-3-04.jpg
Here is some of the work on the ceiling.

studyrooms12-3-04.jpg
This is looking into the area where the new study rooms will be.

hallway12-3-04.jpg
This is the L Building hallway which is temporarily closed right now.

entrance2-12-3-04.jpg
This will be the entrance to the library.

Carpet, Wires, Walls, and Entrances

November 2nd, 2004

We’ve had some big changes over the last week. We now have a temporary entrance that we are using during this stage of the remodeling. Things are really looking great.

newentrance11-1-04.jpg
This photo doesn’t do our new entrance justice, but this is our tempary digs until everything is finished up. Students and the public must use the 107th side of the L Building for the entrance.

oldentrance11-1-04.jpg
This is the current status on the “old” (regular) entrance to the library on the 2nd floor.

wireclassroom11-1-04.jpg
The guys are currently wiring the new library classrooms.

hallway11-1-04.jpg
Here is the temporary wall in the L Building hallway.

Temporary Locations on First Floor

October 22nd, 2004

As the final phase moves long, all libarary services have been moved to the first floor of the library.
phase3A10-22-04.jpg
Here is the temporary circulation desk.

phase3B10-22-04.jpg
This is periodicals.

phase3C10-22-04.jpg
Here is the reference collection.

Move to Phase Three!

October 22nd, 2004

This week has been a busy week. Our staff has done a great job moving circulation and reference to the first floor to make way for the final phase of the remodeling.

upstairsA10-22-04.jpg
Here is the former location of the reference desk.

upstairsB10-22-04.jpg
Here is the empty circulation desk.

upstairsC10-22-04.jpg
This is the area that used to house the open computers.

Carpeting 2nd Floor!

October 13th, 2004

We are happy to see everything coming together. Phase 2, which includes the north half of the second floor, is moving along. Carpet is being laid. This means that Phase 3, which includes the south half of the second floor, will be next!

nanoffice10-04.jpg
Here is Nancy in her future office.

puttingdowncarpet10-04.jpg
Carpet spreading out.

carpetII10-14-04.jpg
Rolling carpet.

classroom10-13-04.jpg
Here is one of the library’s new classrooms.

Temporary Library Entrance Starting October 25th

October 12th, 2004

As the library’s remodeling enters it’s final “chapter,” the entrance to the library will temporarily move to the north side L Building. Beginning October 25th, students, staff and members of the public will enter the library through the L Building parking lot.

Library Will Be Closed Due to Remodeling: Oct. 21-24

October 12th, 2004

Due to the library’s remodeling, the library will be closed October 21st-24th. A temporary lab will be set up on Friday October 22nd from 8am-4pm where students can research. Regular library hours will resume Monday, October 25th.

Paint on the 2nd Floor

October 6th, 2004

The ladies and gentlemen working on the north side of the second floor have been painting and finishing up walls. Some of the lighting has been put in as well.

2ndfloorceiling10-04.jpg